18 projects. Filter by sector, status and city.
Showing 18 projects.
Earthworks, Structures and Superstructure Works. Project reference for Karayolları 9. Bölge Müdürlüğü in Batman.
Silvan Dam Village Roads Construction. Project reference for DSİ 10. Bölge Müdürlüğü in Silvan.
Light Steel Housing (6 Packages, 150 Units). Project reference for Çevre, Şehircilik ve İklim Değişikliği İl Müdürlüğü in Şanlıurfa.
Infrastructure and external works for rural earthquake houses across 20 neighbourhoods in six districts of Şanlıurfa were completed, including stone walls, roads, water and wastewater systems, septic tanks and safety railings.
Earthworks, Structures, Base and Surface Dressing. Project reference for Karayolları 9. Bölge Müdürlüğü in Savur.
BSK Patch Maintenance on Surface-Dressed Roads. Project reference for Malatya Büyükşehir Belediyesi in Malatya.
Emulsion Surface Dressing Asphalt. Project reference for Malatya Büyükşehir Belediyesi in Malatya.
Sivak Asphalt and Surface Dressing. Project reference for Midyat Belediyesi Fen İşleri Müdürlüğü in Midyat.
Earthworks, Structures and Plant-Mix Layers. Project reference for Karayolları 9. Bölge Müdürlüğü in Midyat.
Embankment Retaining Wall and Apron. Project reference for DHMİ Genel Müdürlüğü in Batman.
Double-Coat Emulsion Surface Dressing. Project reference for Malatya Büyükşehir Belediyesi in Malatya.
Junction and Superstructure Works. Project reference for Karayolları 8. Bölge Müdürlüğü in Elazığ.
City Asphalt BSK Paving. Project reference for Batman Belediyesi Fen İşleri Müdürlüğü in Batman.
Granular Sub-Base, Base and Surface Dressing. Project reference for Karayolları 9. Bölge Müdürlüğü in Diyarbakır.
Road Construction. Project reference for Batman İl Özel İdaresi in Batman.
Paving Stone Road and Repair. Project reference for Karayolları 9. Bölge Müdürlüğü in Şırnak.
Earthworks, Structures and Superstructure. Project reference for Karayolları 9. Bölge Müdürlüğü in Batman.
Oil exploration drilling activities are being carried out at designated locations in Hazro, Diyarbakır, for the Turkish Petroleum Corporation (TPAO), using a 500-ton drilling rig equipped with a Top Drive system.
We use essential cookies for secure site operation. Analytics cookies are enabled only with your permission. Read the cookie policy.
Essential cookies cannot be disabled. You may change analytics permission at any time. Rejection does not affect the site's essential features.
For details, cookies used and retention periods, see the Cookie Policy .